|
LABORATORY
FACILITIES STATUS |
|
|
CENTRAL SERVICE |
STATUS |
|
AIR
CONDITIONING |
NORMAL |
|
FIRE
ALARM AND ALERT SYSTEM |
NORMAL |
|
CHILLED
WATER |
NORMAL |
|
COMPRESSED
AIR |
NORMAL |
|
DEIONIZED
WATER |
NORMAL |
|
DRAINAGE
SYSTEM |
NORMAL |
|
ELECTRICITY |
NORMAL |
|
EQUIPMENT
COOLING WATER |
NORMAL |
|
EXHAUST
VENT |
NORMAL |
|
EMERGENCY
VENTILATION SYSTEM |
NORMAL |
|
FUME
CUPBOARD |
NORMAL |
|
NITROGEN |
NORMAL |
|
POTABLE
& NON-POTABLE WATER |
NORMAL |
|
NORMAL |
|
|
TOWN
GAS |
NORMAL |
|
The following are services interruption details: A NORMAL status indicates that the service is operating as usual. As the status of services changes, this bulletin board will be revised
to indicate the changes. You are advised to consult this bulletin board on a regular basis if you
are a user of any of the above-mentioned central services. You should check this bulletin board before commencing any critical
operations using such central services. Data supplied on this bulletin board is updated by CMO (LS), and
represents the best information provided by relevant sections and other
sources. Further inquiries should
be directed to CMO (LS), Miss Alice Lee x6847; Email to eolabser@ust.hk |