LABORATORY FACILITIES STATUS

CENTRAL SERVICE

STATUS

AIR CONDITIONING

SEE NOTE BELOW

FIRE ALARM AND ALERT SYSTEM

NORMAL

CENTRAL NITROGEN

NORMAL

CHILLED WATER

NORMAL

COMPRESSED AIR

NORMAL

DEIONIZED WATER

NORMAL

DRAINAGE SYSTEM

NORMAL

ELECTRICITY

SEE NOTE BELOW

EQUIPMENT COOLING WATER

NORMAL

EXHAUST VENT

NORMAL

EMERGENCY VENTILATION SYSTEM

NORMAL

FUME CUPBOARD

NORMAL

NITROGEN

NORMAL

POTABLE & NON-POTABLE WATER

SEE NOTE BELOW

SAFETY SHOWER & EYEWASH

SEE NOTE BELOW

TOWN GAS

NORMAL

 

 

ELECTRICITY

 

DATE

AFFECTED AREAS

 

1 Feb 2026

CYT building

 

8 Feb 2026

 

AIR CONDITIONING

DATE

AFFECTED AREAS

3 Jan to 16 Jan 2026

AC only: 7167

POTABLE & NON-POTABLE WATER

 

DATE

AFFECTED AREAS

18 Jan 2026

Enterprise Centre

25 Jan 2026

Lab building & LAF

1 Feb 2026

CYT building

7 Feb 2026

Innovation building

SAFTEY SHOWER & EYEWASH

 

26-30 Jan 2026

Academic & CYT building

The following are services interruption details:

A NORMAL status indicates that the service is operating as usual.

As the status of services changes, this bulletin board will be revised to indicate the changes.

You are advised to consult this bulletin board on a regular basis if you are a user of any of the above-mentioned central services.

You should check this bulletin board before commencing any critical operations using such central services.

Data supplied on this bulletin board is updated by CMO (LS), and represents the best information provided by relevant sections and other sources.

Further inquiries should be directed to CMO (LS), Miss Alice Lee x6847; Email to eolabser@ust.hk